About Chris

 

Duties/Responsibilities

I started working for a large irrigation farm operation when I was 12 years old.  I worked on this farm until I graduated high school.  We put in very long hours and worked hard; this is where I gained my work ethic.

I have worked in the construction industry for over 30 years.  I started working for a small ready-mix company in Kansas when I was 21 years old.  My main job was a laborer placing and finishing concrete.  In 1995 I started working for a large concrete company in Kansas City.  I started out as a regional operation manager and had this position for three years.  After those three years I was asked to take over the construction and maintenance operations.  We built and maintained 25 permanent concrete plant locations as well as setting up multiple portable locations.  I worked for this company for over 28 years.  While working for the concrete company I developed many long relationships with many vendors, one being Construction Equipment Parts Inc.  In May of 2023 I was offered the opportunity to go to work for CEPI as a Nation Batch Plant Specialist, and I accepted the position.  I bring a vast knowledge of concrete plants and operations with me.

I have been married to my wonderful wife for 28 years and we have a 24-year-old son and 20-year-old daughter.  My true passion is the outdoors.  I love bow hunting and I also love to golf.  I have also been doing taxidermy for over 30 years.

 

800-745-3414

Available Nationwide

 

Texas:

2679 Myrtle Springs Ave

Dallas, TX 75220

Arizona:

3757 E Broadway Rd, Suite 6

Phoenix, AZ 85040

Illinois:

34 Empire Drive

Belleville, IL 62220

Georgia:

18 Peachtree St.

Cartersville, GA 30120

Pennsylvania:

3 Industrial Drive

Birdsboro, PA 19508

 

-2 years as a concrete laborer/ carpenter/finisher at Mid Plains Construction

-3 years as a field rep/sales/plant operations at Penny’s Concrete Inc.

-25 years as head of plant construction/ maintenance at Penny’s Concrete Inc.

 

Duties:

-Built, operated, and maintained 24 concrete batch plants:

-11 Central mix (All Rex-Con)

-13 Dry Plants (Con-E-Co, McNeilus, Belgrade, Vince Hagan, Johnson)

 

Additional Duties / Responsibilities:

-Managed 7 employees & supervised 17 employees

-Engineered (not licensed) & designed plant layouts, foundations, wash pits, and water discharges

-Engineered, designed, and built:

-Plant support structures

-Plant agg storage bins

-Catwalk & work platforms

-Discharge Hoods

-Grizzlies

-Guillotines

-Conveyors & conveyor support structures

-Discharge chutes

-Underground pit hoppers & structures

-Water holding tanks & scales

-Electrician (not licensed) both high & low voltage

-HVAC Tech (not licensed)

-Plumber (not licensed) complete plant water design & installation

-15-year current certified crane operator (NCCO Certificate)

-Former ACI Certified Grade 1 Tech

-Dust collection design & installation-Central & Silo Top (C&W, Griffin, BHA, Con-E-Co Systems)

-Landscaping/Irrigation

-Backflow Systems

-Air Compressor Tech

-Hydraulics

-Pneumatics

-Equipment Operator - Many different types

-Mechanic

-Operated portable rock crushing operation

-Managed Sand Plant Dredging & Operations

-Moved & Set up Many portable wet & dry plant locations

-Completely designed and built eight new concrete plant locations for Penny’s Concrete Inc.

 

 

 

 

 

 

 

 

 

 

 

 

 

 